Home / Case Studies / Heathrow Cargo X-ray
Cargo · 2026
Big Tunnel, Tight Timeline
The first two Hissco cargo X-ray systems in the UK, installed across two sites for an air-freight operator in the Heathrow area. Container to fully built and certified in three days, using a forklift our own engineers were licensed to drive.
Air cargo screening machines are the heavyweights of the fleet: tunnel openings up to 1.8 metres square, multi-tonne conveyor loads, and buildings that were rarely designed with them in mind. Getting one in, positioned, powered and certified is a specialist job.
As exclusive UK & Ireland distributor for Hissco International, RedteQ supplied, installed and commissioned Hissco HS 1818 DV 200kV full-pallet systems at two separate sites for a freight operator near Heathrow in 2026. These were the first two Hissco cargo X-ray systems installed anywhere in the UK, and they have set the standard for what follows: image quality, build quality and turnaround that the operator now measures every other system against. Route survey, offload, rigging, positioning, build, commissioning, radiation compliance and operator familiarisation: all by our own team, at both locations.
Forklift Trained, So Nobody Waits
Systems this size arrive in a container, and most installers then wait on someone else's plant and someone else's driver. We don't. RedteQ engineers are fully forklift trained and certified, so we simply hired in a forklift and did it ourselves: the system came off the container, straight into site, and the entire machine was built using the forklift as our lifting gear.
It removes a whole category of delay from the programme. No third-party lift crew to schedule, no standing around while a slot is found, no handover of responsibility halfway through a lift. The result at both sites: fully built, tested and certified on day three, with the operator screening freight straight after.
Two sites, two HS 1818 DV 200kV systems: offloaded, built and certified by the same RedteQ team.
Why Freight Operators Call Us
- The full Hissco range: from checkpoint scanners to the HS 1818 DV full-pallet system
- Installation is ours, end to end: surveys, offload, rigging, build, commissioning and IRR17 compliance
- Licensed to lift: forklift-trained engineers who unload and build without waiting on third-party plant
- Multi-site, one team: the same crew, the same standard, at every location
- Support after the photo: nationwide maintenance from the team that installed it